Designing of HDD pipes according to DWA-A 161 / DVGW GW 312 |
Frederik Müller |
IngSoft |
Germany |
Pipeline Technology Conference 2023 |
Trenchless Technologies |
Crossing with Care - Major HDD crossings on the TAP project |
Denis Pellerin |
Horizontal Drilling International (HDI) |
France |
Pipeline Technology Conference 2019 |
Construction, Planning and Design, Trenchless Technologies |
Defining the Limits Of Application Of Directional Drilling Technology During Construction Of Pipeline Underwater Crossings |
Dmitry Shatalov |
Pipeline Transport Institute (PTI LLC) |
Russia |
Pipeline Technology Conference 2018 |
Trenchless Technologies |
Continuous Monitoring of Pipe Coating During Pulling Operation in a Horizontal Directional Drilling (HDD) |
Kamyar Darbandi |
Steffel |
Germany |
Pipeline Technology Conference 2015 |
Coating, Trenchless Technologies |
Trenchless Pipeline Removal (TPR) |
Benedetta Furlani |
ENERECO Engineering and Consulting |
Italy |
Pipeline Technology Conference 2014 |
Trenchless Technologies |
Trenchless Installation with Polyamid 12 - the new protection for pipes |
Markus Hartmann |
Evonik Industries |
Germany |
Pipeline Technology Conference 2017 |
Trenchless Technologies |
Construction of a high-pressure gas pipeline PN 25 by means of trenchless technologies in the Czech Republic |
Robert Goletz |
Rädlinger Primus Line |
Germany |
Pipeline Technology Conference 2019 |
Construction, Corrosion, Environmental Impact, Repair Works, Trenchless Technologies |
Trenchless rehabilitation of water mains with a Kevlar reinforced composite lining system |
Andreas Gross |
Rädlinger Primus Line |
Germany |
Pipeline Technology Conference 2018 |
Trenchless Technologies |
Nord Stream Onshore Pipeline Projects OPAL and NEL. Extraordinary Constructions for River Crossings by HDD or Microtunnel |
Stefan Scholz |
GASCADE Gastransport |
Germany |
Pipeline Technology Conference 2012 |
Construction, Trenchless Technologies, Planning and Design |
Soil Friction Modeling in HDDs under Operational Conditions |
Frigco Kwaaitaal |
Tebodin Netherlands |
Netherlands |
Pipeline Technology Conference 2012 |
Trenchless Technologies, Simulation |
A Major Step for a Pipeline: Crossing the Serra do Mar State Park in Brazil |
Philipp Elsner |
Babendererde Engineers |
Germany |
Pipeline Technology Conference 2012 |
Construction, Logistics, Trenchless Technologies |
Trenchless replacement of defective sewer pipelines using pipe bursting |
Daniel Mertens |
TRACTO-TECHNIK |
Germany |
Pipeline Technology Conference 2016 |
Trenchless Technologies |
Pipe Ramming machines for HDD Assist & Rescue ensuring smoothly running pipeline jobsites |
Dr. Hans-Joachim Bayer |
TRACTO-TECHNIK |
Germany |
Pipeline Technology Conference 2017 |
Trenchless Technologies |
Efficient application of the Horizontal Directional Drilling technology in pipeline construction |
Dr. Hans-Joachim Bayer |
TRACTO-TECHNIK |
Germany |
Pipeline Technology Conference 2013 |
Trenchless Technologies, Construction |
An Innovative New Technology for Trenchless Rehabilitation of High Pressure Gas/Liquid Transmission Pipelines |
Dr. Melvin F. Kanninen |
Smart Pipe Corporation |
United States |
Pipeline Technology Conference 2008 |
Trenchless Technologies, Rehabilitation |
Comparison of Pressure Transfer Rings for Jacking Pipes |
Prof. Dr. Markus Thewes |
Ruhr Universität Bochum |
Germany |
Pipeline Technology Conference 2009 |
Trenchless Technologies |
Method Comparsion Between Horizontal Directional Drilling, Microtunneling, Shields with Partical Face Extraction and Easy Pipe |
Dr. Hans-Jürgen John |
Meyer & John GmbH & Co. KG |
Germany |
Pipeline Technology Conference 2007 |
Trenchless Technologies |
EASY PIPE - a New Technology for Trenchless Installation of Large Diameter Steel Pipelines |
Dr. Rüdiger Kögler |
Ing.-Büro DR. KÖGLER |
Germany |
Pipeline Technology Conference 2006 |
Trenchless Technologies, Construction |
New trenchless technology for small diameters and long drives and its use in underground cable installation |
Michael Lubberger |
Herrenknecht |
Germany |
Pipeline Technology Conference 2017 |
Trenchless Technologies |
The Herrenknecht Pipe Thruster - Key Innovation in Pipeline Construction |
Dr. Marc Peters |
Herrenknecht |
Germany |
Pipeline Technology Conference 2009 |
Construction Machinery, Trenchless Technologies |
A Variety of Trenchless Technologies for Pipeline installation |
Michael Lubberger |
Herrenknecht |
Germany |
Pipeline Technology Conference 2016 |
Trenchless Technologies |
Europe´s Gas Supply Network: Key projects for trenchless methods and Pipe Express |
Diana Rennkamp |
Herrenknecht |
Germany |
Pipeline Technology Conference 2020 |
Trenchless Technologies |
Innovative Trenchless Solutions For Pipeline Crossings And Landfalls |
Diana Rennkamp |
Herrenknecht |
Germany |
Pipeline Technology Conference 2018 |
Trenchless Technologies |
Various Trenchless Techniques for Pipeline Installation under Rivers and Mountains |
Werner Suhm |
Herrenknecht |
Germany |
Pipeline Technology Conference 2006 |
Trenchless Technologies |
Trenchless pipeline installations in European key projects |
Michael Lubberger |
Herrenknecht |
Germany |
Pipeline Technology Conference 2021 |
Construction, Trenchless Technologies |